We finally got an Internet connection installed on Monday 25th February, and for a while had Ethernet cables running through the hallway (covered by left-over carpet in the doorways to prevent against tripping to some extent). On Sunday 2nd March, however, we installed some proper network cabling. We now have cables running from wall jacks in Josiah’s room (where the cable modem and router is) to similar jacks in Jordan’s and my room. It took longer than I expected, mostly due to difficulty drilling a hole through the wall beside my wardrobe door.
It ended up being quite a flat affair, as you can see in these photos:
10 March 2008 at 9:49 pm
Very impressed that you know in advance that you will get it installed on 25 March. Perhaps you mean 25 Feb.
10 March 2008 at 10:29 pm
Oops, thanks for pointing that out, fixed.
10 April 2008 at 12:35 am
That’s such a bad photo of me andrew!! =(